Case studies

Recent work for our customers

Customer names are left out at their request. The numbers are real for these jobs.

Agricultural equipment

Grain cart frames: 14% less weld time

The job: 420 grain cart main frames a year, each about 2,800 lb, ready four months before harvest.

What we did: We moved the long seams to a robotic cell, built two matched fixtures and changed three plate parts from cut-and-weld to formed bends.

  • Weld time per frame down 14%
  • First-pass weld rejects 0.6%
  • All 420 frames shipped 3 weeks early

Material handling

Conveyor sections: taken over in five weeks

The job: A conveyor builder lost its fabricator to a closure, with 60 sections a month on order.

What we did: We reverse checked their drawings against sample parts, built fixtures in two weeks and shipped first parts in week five.

  • Five weeks from first call to first delivery
  • 97% on-time releases over 18 months
  • Lead time cut from 6 to 3 weeks

Construction equipment

Excavator buckets: 9% lower cost

The job: A family of buckets for compact excavators in abrasion-resistant plate, 300 units a year.

What we did: Our engineer suggested a bent side plate that removed 11 welds. The customer tested it for a season before approving it.

  • 11 fewer welds per bucket
  • Unit cost down 9%
  • No field cracks reported after 14 months

More results

Smaller wins that add up

Railcar step assemblies

Switched from bolted to welded brackets. Install time at the customer cut by 6 minutes per car.

Lift table frames

Added a line-bore step after welding. Pin wear complaints dropped from 9 a year to 1.

Sprayer booms

Moved paint to our own line. Delivery time cut from 5 weeks to 3 weeks.

Request a quote

Send drawings today. Get a quote in three working days.

Line-item pricing, lead times and fabrication notes from an engineer who has run the floor. Most quotes go out within three working days.